Here are some pictures from the floor poly.
| First coat of poly |
| Second coat of poly |
| Final coat of poly, still wet. |
Recent progress on the kitchen/bath include:
We picked out and installed a toilet.
Ordered a mirror for the 1/2 bath (will be here on Wednesday) and hopefully in one piece.
We received the fridge panel, it is temporary installed with a clamp.
We googled for hours on the right location for cabinet knobs---still seems TBD, hollar if you have opinions.
We
I finished stripping the bathroom and kitchen entry doors (whattt a project---post to come on that).
Mom washed, cleaned and organized our kitchen. What a saint. She has a nice picture on her iPhone of all the dishes she washed by hand. I then told her our dishwasher has a 1-hour wash cycle. If she reads the blog maybe she'll send me the photo and I'll post :-)
Installed light fixture in eat-in part of kitchen.
Took the plastic off our appliances :-)
Still have a long to-do list:
Paint & Prime two doors
Paint slider and three windows
Install kickboards
Install crown molding
Install cabinet hardware
Put in trim----really would LOVE to match trim with rest of house, however don't feel like stripping TONS of trim and some may have been damaged during demo.
Pick out a BACKSPLASH so that Tommy Tile and SISIL can come do it
Pick out stools for eat in portion.
Order light for over kitchen sink.
I'm sure it keeps coming....just can't think of anything.
Next post will hopefully be bathroom reveal! That will be complete as soon as I can get the hubby to install the mirror.


